Tuesday, May 17, 2011

90% Done

So our operation drywall is 90% done, let me tell you nevvvvvveeeerrrrr again will I do drywall. Patching is fine but no hanging and finishing. The ceiling looks decent but the seams are still visible to me, they could have been sanded for another two weeks before they looked really good and flat via the ceiling fixture. It does look loads better than the cracked textured over plaster though.

 All in all we took down the closet, installed and finished the ceiling drywall, patched a large section of a wall with drywall, installed the chair rail and quarter round that was covered by the closet, primed and painted the wall that was in the closet and installed crown molding. Photos of the craziness:
Wall patched, primed and partially painted.

Sand, sand, sand and sand some more...

Finished and furniture moved back in..